Repair plans separate finishes from building work
Addison's permit checklist requires permits for building, remodeling or enlarging a building, foundation repairs, electrical work and plumbing work, exempts cosmetic painting, wallpapering, carpeting, cabinets and trim work, and requires contractors doing permitted work to register with the town unless the homeowner obtains the permit in their own name. For fire damage repair in Addison, describe whether the damage stops at paint and cabinets or extends into the wall behind them. A repair discussion can begin with the surfaces you already know were affected.
Bulk pickup has material limits
Addison's Trash & Recycling page offers staff home pickup of qualifying bulk items for single-family residents with a minimum of 48 business hours allowed, rejects refrigerant-containing appliances, concrete/asphalt, bricks/landscaping rock, tile flooring, soil and tires, and directs eligibility questions to Public Works and Engineering at 972-450-2871. A burned cabinet and torn-out tile flooring should be discussed separately during cleanout planning. Describe what needs removal so discarded belongings and repair debris can be considered by material.
Address and access details shape the call
Give the street address, the rooms the fire reached and any access limits firefighters already gave during the call. Known room names and restrictions are enough to begin describing the damage. For Addison residents bringing a driver's license and a water or other utility bill proving their address, Dallas County's Household Hazardous Waste page identifies free service at the Home Chemical Collection Center, 11234 Plano Road; the service is for residents of listed cities, while residents of other cities pay waste management fees.